FAQ

Most frequent questions and answers
What does Asali Bali mean?

Asali is the sanskrit word for origin (asli in indonesian), so Asali Bali stands for Bali’s origins and perpetuates the bamboo tradition.

What services of construction do you offer?

We provide engineering consulting for bamboo structures as well as professional construction for sustainable bamboo structure and roofing such as: hotels, restaurants, educational, residential, commercial, industrial, bungalows…and all other demand or request from the clients.

What are the information and documents you need in order to have a first estimation and start the collaboration together?

In order to provide a first estimation, we would like to know:

  • The location of your project and topography levels
  • The dimensions of the buildings
  • The functions of your project
  • First drawings and sketches from the architect
  • Estimated timeline wanted
  • Estimated budget if any to propose the most adapted solutions.
Do you also build outside of Bali?

In order to promote bamboo material and construction, we can build bamboo buildings all over Indonesia and worldwide. Our activity so far is 40% in Bali and nearby, 50% on the other islands of Indonesia and 10% abroad. Please have a look at the map of the projects we have built so far.

How high and wide can we build with bamboo?

We can build as high/width as the other type of structure. We will add more bamboo materials and structure sections when needed. A particular focus will be given to direct sun as well as roofing and moisture exposure for long lasting buildings.

How long does a bamboo building last?

Bamboo material and bamboo structures have 3 main causes of degradation:

  • Insects: cellulose and starch present in the bamboo will attract the insect.
  • Direct exposure to sunlight: UV will destroy the natural silicate protection of the bamboo.
  • Permanent source of moisture: Above 20% of moisture inside the bamboo, mushrooms can develop and lead to rotten bamboo.

If the bamboo is exposed to 1 of this potential to cause a degradation, a lifetime of 6 months – 3 years is expected.

Once we treat the bamboo against the insects and adapt our design to protect the bamboo structure regarding sun and moisture exposure, there is no cause of degradation. With a regular survey in order to check this compliance, it will last for long term.

We propose a yearly maintenance contract attached to structural guarantee which can be extended for 10 years.

Do you provide a guarantee for the bamboo structure?

By default, we include a 1 year guarantee for the bamboo structure. As a professional of construction, we propose a yearly maintenance contract attached to structural guarantee which can be extended for 10 years.

Where does the bamboo you use come from?

All the bamboo used are sourced in Bali, Indonesia. For particular types of projects, depending on the size, design, location and after a particular survey onsite, the bamboo material can be sourced and treated directly onsite optimizing transport and logistics.

What types of bamboo do you use for your bamboo constructions?

For our constructions, the bamboo species most commonly used are:

  • Bamboo petung (Dendrocalamus Asper):  for columns and main beams
  • Bamboo tali (Gigantochloa Apus):  for rafters and roof structure
  • Bamboo duri (Bambusa Blumeana): for railing and interiors
  • Black bamboo (Dendrocalamus Asper Sp.): for original and classy rendering
What roofing can be used?

Depending on the wanted design, integration into its environment and budget, any type of roof can be used, such as alang-alang (thatch), pelupuh (flattened bamboo), different type of tiles made of bamboo or wood or ceramic as well as zinc or green roofing…

Are your buildings environmentally friendly?

Bamboo is a grass which grows fast and can get 20 to 30m in 3 to 6 month depending on the species.

For 3 to 5 years the bamboo will grow wall thickness and is mature to be harvested for construction.

Out of one clump of bamboo, an average of 20-30 bamboo culms can be cut yearly.

Everytime a pole is cut about 50-60cm from the ground, another shoot will grow directly out the clump.

Maintaining by cutting bamboo will allow the poles more space for the other culms to grow, straight and strong and will give a boost of energy to the plant.

Is bamboo resistant to rain, sun?

In order to treat our bamboos against insects we drill them lengthwise and then soak them in a bath based with natural salts (borax and boric acid) for a duration of 3 to 7 days depending on the diameters.

What type of treatment do you use on your bamboo?

In order to treat our bamboos against insects we drill them lengthwise and then soak them in a bath based with natural salts (borax and boric acid) for a duration of 3 to 7 days depending on the diameters.

Do you do bamboo structure and roofing only or also foundations, electricity and plumbing?

As bamboo structure specialists, we focus on this particular and technical point to provide the best service possible. In order to have your project completed, please have a look at our professional partners.

Do you also build bamboo furniture?

Based on your drawings and design, we can facilitate the bamboo furniture with our local partners in the village.

Do bamboo buildings need to be maintained?

Once the bamboo are properly treated against insects and the buildings well designed to avoid direct sun and source of moisture, the maintenance would consist in a regular checking (twice a year, once before the rainy season and once after)

How works the maintenance for bamboo building?

Maintenance consists of a regular visual inspection of the structure as well as the humidity level, we check and ensure the integrity and durability of the bamboo structure.
We include a one-year warranty in our quotes by default. We can extend this warranty to 10 years (linked to the maintenance contract) for a cost of 1% of the bamboo structure / year (excluding transport).

Can i get an insurrance for the bamboo building?

In addition to the maintenance contract and the guarantee of the bamboo structure, you can take out insurance covering all property inside the buildings as well as all types of risks not covered by the guarantee. In Indonesia, we can recommend Allianz and Asuransi Abda to provide you with comprehensive insurance for your buildings.

Allianz insurance website

What is the cost of bamboo construction per m2?

As a rough estimate, to build in Bali, bamboo construction starts around 1.5 juta/m2 (100 USD/m2) for industrial buildings to 5 juta/m2 (330 USD/m2) for residential buildings which more complex usually. This estimation includes the bamboo structure, roofing and finishing (excluding foundations, floors, walls, stairs, MEP, interiors and logistics). The final construction cost will depend on the location, design, function of the building and any interior details.

A first phase of studies to define the design of the bamboo building as well as the carrying out of technical studies is necessary in order to obtain the execution documents used to proceed with the building permit as well as to be able to determine the final price for the construction. The price of the studies is around 150 – 500krp/m2 (10-33 USD/m2) depending on the size and complexity of the building.

Which aspects are not covered by Asali Bali?
  • Foundations:

Must be done by a general contractor and are not included in our quotes. The foundations must be sized according to the loads on the bamboo structure supports and soil analysis.

  • Logistics (outside Bali):
    – Material transportation.
    – Transportation of workers and coordinators to the construction site.
    – Accommodation for workers and coordinators on site.
  • Logistics (outside Indonesia):
    – Transport of equipment and material (see our partner PT Cargo Limajari )
    – Transportation of workers and coordinators to the construction site.
    – Accommodation and food for workers and coordinators on site.
    – Administrative costs (work visa, passports, import taxes, etc.)
What are your terms of payment?

Once the bamboo quotation is approved, we require a deposit of 40-50% of the total cost in order to prepare material and teams. The balance is divided in between the other parts of the bamboo building depending on the size of the project and work to be done.

Is a building permit required for the construction of bamboo buildings?

For any permanent construction, a building permit is required (PBG in Indonesia). The legislation and procedure will be different for each location/area. It usually takes 2-3 months to obtain building permit once all drawings have been submitted.

Can we build in agroforestry areas?

Bamboo being a natural material, it is usually permitted to construct bamboo buildings in agroforestry areas, however it is necessary to inquire with local authorities for final validation. In addition, PBG processes are generally 50% cheaper than regular buildings in Indonesia.

How do you ensure stiffness and security of the bamboo structure?

We calculate the bamboo structure based on the Eurocodes wood calculation, following international standards developed by INBAR (International Network for Bamboo and Rattan: https://www.inbar.int/). A 3D structural model including a simulation of wind forces is produced to dimension the structure and ensure the stability of the building.

How does bamboo structure resist strong winds and earthquakes?

Winds:
In order to comply with Indonesian legislation and standards of construction (SNI 1727: 2013), a wind speed of 140,8km/hrs (39,1m/s) for strength design and 115,2km/hrs for serviceability design are considered. For projects outside of Indonesia, the local standards for wind speed will be applied.

Earthquakes:
As the bamboo is light and flexible, bamboo buildings are more resistant to earthquakes in comparison with other types of buildings. The coefficient of Fail Safe (Express the ability to withstand very strong external accidental stresses) will be 2,5 superior for bamboo than steel and timber structures and 5 times more than concrete buildings.
https://www.bambouscience.fr/category/science/

Depending on the category and location of the building, a seismic verification would be needed. For Indonesia, the level of importance regarding earthquakes is given on the national maps (SNI 1726: 2012). For other countries, we will comply with local legislation regarding earthquakes when required.

How do you protect your buildings regarding fire?

Bamboo poles have a natural layer of silicate on the top skin which protect against fire. The borax – boric salts used for the treatment add an extra protection.
For specific requirements an extra coating of fire protection can be applied on top of the bamboo poles.

Here is a product we recommend to apply (non exhaustive): http://hartindo.co.id/products/hartindo-af21/

What are the steps to build a bamboo building?

1 – First meeting and review of the project based on architects drawings for a first estimation  and timing of your project.

2 – Architectural drawings (1 – 6 months). Please look at partners to meet with the architect the most adapted to your project.

3 – Structural studies and small scale models in order to ensure stiffness, durability and define together the best options for your project. (2 weeks – 4 months) A related quotation as well as estimated planning of construction for the bamboo building will be proposed at this stage.

4 – Once contracts are signed and deposit done, we will prepare the bamboo material and teams, transport of material (1 – 2 months)

5 –   Bamboo construction (1 – 6 months). The foundations should be built with a local contractor or partners before installing the bamboo structure. Electricity and plumbing can be prepared as well. (1 – 4 months)

  1.   Bamboo columns
  2.   Roof bamboo structure
  3.   Roofing
  4.   Finishing on bamboo structure 

6 –  Delivery of the bamboo structure, interiors and landscaping

7 – Grand Opening!

How long should be expected for the bamboo construction onsite?

Depending on size, design and function of the building, it usually takes:

  • Ground area: 0-100m2: 1 month.
  • Ground area: 100-200m2: 2 months
  • Ground area: >200m2: 3-6 months
How many workers are for each bamboo team?

The teams of bamboo workers (from 5 to 50 people) are adapted according to the technical specificities for each project and the deadlines desired by the client.

How does the Indonesia Building Permit (PBG) work?

The Building Approval PBG (Persetujuan Bangunan Gedung) is a permit granted by the government to allow building owners to build, change, expand, reduce, and/or maintain buildings according to the applicable technical building standards.